Monday 7 July 2008

Concrete floor

Concrete floor laid in existing building and extension.


Saturday 5 July 2008

First floor

First floor joists installed.
Timber is placed into steel work.

Extension footings put down.


Saturday 28 June 2008

Block work.

South facing wall rebuilt with windows and door holes.


Original barn entrance gets filled in.

Extension footings excavated.


Footings for extension which will be 5m by 5m in size.

Sunday 22 June 2008

Stock proof fencing erected around back garden.




North facing wall work commences.

Part of the North facing wall being removed. An extension will be built here using original stone from demolished walls. Old plaster is removed from the remaining walls.